{
    "archive_path": "archive/1790719585.273751",
    "base_url": "cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027",
    "basename": "",
    "bookmarked_date": "2026-09-29 22:06",
    "canonical": {
        "archive_org_path": "https://web.archive.org/web/cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027",
        "dom_path": "output.html",
        "favicon_path": "favicon.ico",
        "git_path": "git/",
        "google_favicon_path": "https://www.google.com/s2/favicons?domain=cdispatch.com",
        "headers_path": "headers.json",
        "htmltotext_path": "htmltotext.txt",
        "index_path": "index.html",
        "media_path": "media/",
        "mercury_path": "mercury/content.html",
        "pdf_path": "output.pdf",
        "readability_path": "readability/content.html",
        "screenshot_path": "screenshot.png",
        "singlefile_path": "singlefile.html",
        "warc_path": "warc/",
        "wget_path": "cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/index.html"
    },
    "domain": "cdispatch.com",
    "extension": "",
    "hash": "EWB5EYNC4XJW2EVGP05C",
    "history": {
        "archive_org": [],
        "dom": [],
        "favicon": [
            {
                "cmd": [
                    "curl",
                    "--silent",
                    "--location",
                    "--compressed",
                    "--max-time",
                    "120",
                    "--output",
                    "favicon.ico",
                    "--user-agent",
                    "Mozilla/5.0 (Macintosh; Intel Mac OS X 10_15_7) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/118.0.0.0 Safari/537.36 ArchiveBox/0.7.4 (+https://github.com/ArchiveBox/ArchiveBox/) curl/curl 8.14.1 (x86_64-pc-linux-gnu)",
                    "https://www.google.com/s2/favicons?domain=cdispatch.com"
                ],
                "cmd_version": "curl 8.14.1 (x86_64-pc-linux-gnu)",
                "end_ts": "2026-09-29T22:21:54.160818+00:00",
                "index_texts": null,
                "output": "favicon.ico",
                "pwd": "/data/archive/1790719585.273751",
                "schema": "ArchiveResult",
                "start_ts": "2026-09-29T22:21:53.739568+00:00",
                "status": "succeeded"
            }
        ],
        "git": [],
        "headers": [
            {
                "cmd": [
                    "curl",
                    "--silent",
                    "--location",
                    "--compressed",
                    "--head",
                    "--max-time",
                    "120",
                    "--user-agent",
                    "Mozilla/5.0 (Macintosh; Intel Mac OS X 10_15_7) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/118.0.0.0 Safari/537.36 ArchiveBox/0.7.4 (+https://github.com/ArchiveBox/ArchiveBox/) curl/curl 8.14.1 (x86_64-pc-linux-gnu)",
                    "https://cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/"
                ],
                "cmd_version": "curl 8.14.1 (x86_64-pc-linux-gnu)",
                "end_ts": "2026-09-29T22:21:54.520027+00:00",
                "index_texts": null,
                "output": "headers.json",
                "pwd": "/data/archive/1790719585.273751",
                "schema": "ArchiveResult",
                "start_ts": "2026-09-29T22:21:54.170191+00:00",
                "status": "succeeded"
            }
        ],
        "htmltotext": [],
        "media": [],
        "mercury": [
            {
                "cmd": [
                    "/app/node_modules/@postlight/parser/cli.js",
                    "https://cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/"
                ],
                "cmd_version": "1.0.0",
                "end_ts": "2026-09-29T22:22:05.360210+00:00",
                "index_texts": null,
                "output": "mercury",
                "pwd": "/data/archive/1790719585.273751",
                "schema": "ArchiveResult",
                "start_ts": "2026-09-29T22:22:02.048342+00:00",
                "status": "succeeded"
            }
        ],
        "pdf": [],
        "readability": [
            {
                "cmd": [
                    "/app/node_modules/readability-extractor/readability-extractor",
                    "/tmp/tmpq6adwydd",
                    "https://cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/"
                ],
                "cmd_version": "0.0.11",
                "end_ts": "2026-09-29T22:22:02.035686+00:00",
                "index_texts": [
                    "CLW approves $10.2M water, sewer improvements for FY 2027\t\n\t\n\t\t\t\t\t\n\t\t\t\t\t\n\n\t\t\t\t\u00a0 \u2022 4 mins to read\n\t\t\t\n\t\t\t\n\n\t\n\t\n\t\t\n\n\t\n\n\t\t\n\t\tAngela Verdell, general manager for Columbus Light and Water, speaks during Thursday\u2019s utility board meeting. The board approved $10.2 million in water and sewer capital improvements for Fiscal Year 2027, alongside an additional $10.7 million in electrical infrastructure improvements approved in June. Braden Simmons/Dispatch Staff\t\n\t\n\t\n\t\t\tColumbus Light and Water\u2019s Board of Commissioners has approved budgeting for nearly $21 million in water and electrical capital improvement projects for next fiscal year.\nThe cost of those projects will be covered by $1.5 million in expected net income alongside more than $18 million in additional funding sources.\nBeyond the budget\u2019s big-ticket item of $6.4 million allocated for repairs and labor for the utility provider\u2019s water meters, the budget\u2019s second-largest capital project is more than $3.3 million in necessary sewer system improvements to several lift stations.\n\u201cWe worked to create a budget that reflects the things and the goals that we have for this upcoming fiscal year,\u201d Angela Verdell, general manager for CLW, told the board. \u201cThis budget is going to be larger than the budgets have been in the past because we have some major capital projects that we\u2019re going to undertake this year.\u201d\n\n\t\t\t\n\t\t\t\n\t\t\t\t\n\t\t\t\tAngela Verdell\n\t\t\t\t\n\t\t\n\nMore than 11,000 of CLW\u2019s water meters in 2014 were replaced with what were marketed as technologically advanced meters that could offer drive-by radio reads rather than manual readings.\nThe roughly $3.5 million project was contracted to Utility Meter Services Inc., which handled the costs of the meters and their installation.\nVerdell said those meters have slowly deteriorated over the years and are now in need of replacement to help provide more accurate digital readings and to take away the burden of manual readings.\n\u201cWe\u2019re looking for meters that will give us features to be able to certainly \u2026 (improve) detection in terms of water loss that will improve meter reading,\u201d Verdell told The Dispatch. \u201cWe know the meters that we have right now are not as accurate as they could be. We\u2019re looking for meters that will allow us for direct submittal of data into our system, and we\u2019re looking for meters that will be compatible with our billing system.\u201d\nVerdell said she was unsure how much water is being lost due to damaged or malfunctioning meters.\n\u201cWater utilities have water loss numbers, period,\u201d Verdell said. \u201cSo it\u2019s just a matter of trying to drill down and to determine where the loss is coming from.\u201d\nVerdell said CLW will first bid out the costs of those meters and expects them to land close to the roughly $4.8 million that was approved in the FY 2027 budget.\nThe remaining costs for the project include $1 million budgeted for labor, and the remaining $600,000 is allocated for meter cover replacements.\nJeff Smith, CLW board attorney, said during the meeting that part of the reasoning behind separately bidding those projects out was to receive competitive bids to lower the potential cost.\nVerdell said she hopes to see bids come in by October for the meters themselves and to begin bidding out for installation and the meter caps shortly after to begin installation within the next year.\nBeyond the meter project, CLW also budgeted $3.3 million in sewer upgrades, including $2.5 million for renovations at its Caledonia CCP sewer lift station. A bid for $1.3 million of that total project was approved Thursday, and Verdell said work installing new motors and pumps at the station could start as soon as October.\nThe board approved its FY 27 electrical budget at its regular meeting in June, Verdell said.\nCLW expects to receive more than $46 million in electrical sales revenue, with about $45 million of that going to cover expenses for the utility provider.\nA projected $1.1 million in net profit will be added to additional sources of funding to give the utility provider $10.4 million in available funds.\nThe provider will apply $11.8 million to capital expenditures and long-term debt relief, leaving a nearly $1.4 million shortfall, which will be covered by reserves.\n\t\t\t\n\t\t\t\t\t\t\n\t\t\t\t\t\t\n\t\t\t\n      \n      \n        Quality, in-depth journalism is essential to a healthy community. The Dispatch brings you the most complete reporting and insightful commentary in the Golden Triangle, but we need your help to continue our efforts. In the past week, our reporters have posted 37 articles to cdispatch.com. Please consider subscribing to our website for only $2.30 per week to help support local journalism and our community."
                ],
                "output": "readability",
                "pwd": "/data/archive/1790719585.273751",
                "schema": "ArchiveResult",
                "start_ts": "2026-09-29T22:22:00.371766+00:00",
                "status": "succeeded"
            }
        ],
        "screenshot": [],
        "singlefile": [],
        "title": [
            {
                "cmd": [
                    "curl",
                    "--silent",
                    "--location",
                    "--compressed",
                    "--max-time",
                    "120",
                    "--user-agent",
                    "Mozilla/5.0 (Macintosh; Intel Mac OS X 10_15_7) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/118.0.0.0 Safari/537.36 ArchiveBox/0.7.4 (+https://github.com/ArchiveBox/ArchiveBox/) curl/curl 8.14.1 (x86_64-pc-linux-gnu)",
                    "https://cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/"
                ],
                "cmd_version": "curl 8.14.1 (x86_64-pc-linux-gnu)",
                "end_ts": "2026-09-29T22:22:00.363987+00:00",
                "index_texts": null,
                "output": "CLW approves $10.2M water, sewer improvements for FY 2027 - The Dispatch",
                "pwd": "/data/archive/1790719585.273751",
                "schema": "ArchiveResult",
                "start_ts": "2026-09-29T22:22:00.337594+00:00",
                "status": "succeeded"
            }
        ],
        "wget": [
            {
                "cmd": [
                    "wget",
                    "--no-verbose",
                    "--adjust-extension",
                    "--convert-links",
                    "--force-directories",
                    "--span-hosts",
                    "--no-parent",
                    "-e",
                    "robots=off",
                    "--reject=js,mjs,woff,woff2,ttf,otf,eot,mp4,m4v,mov,webm,ogv,mkv,avi,flv",
                    "--timeout=120",
                    "--restrict-file-names=windows",
                    "--page-requisites",
                    "--user-agent=Mozilla/5.0 (Macintosh; Intel Mac OS X 10_15_7) AppleWebKit/537.36 (KHTML, like Gecko) Chrome/118.0.0.0 Safari/537.36 ArchiveBox/0.7.4 (+https://github.com/ArchiveBox/ArchiveBox/) wget/GNU Wget 1.21.3",
                    "--compression=auto",
                    "--timestamping",
                    "https://cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/"
                ],
                "cmd_version": "GNU Wget 1.21.3",
                "end_ts": "2026-09-29T22:22:00.329077+00:00",
                "index_texts": null,
                "output": "cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/index.html",
                "pwd": "/data/archive/1790719585.273751",
                "schema": "ArchiveResult",
                "start_ts": "2026-09-29T22:21:54.528378+00:00",
                "status": "succeeded"
            }
        ]
    },
    "icons": null,
    "is_archived": true,
    "is_static": false,
    "latest": {
        "archive_org": null,
        "dom": null,
        "favicon": "favicon.ico",
        "git": null,
        "media": null,
        "pdf": null,
        "screenshot": null,
        "singlefile": null,
        "title": "CLW approves $10.2M water, sewer improvements for FY 2027 - The Dispatch",
        "warc": null,
        "wget": "cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/index.html"
    },
    "link_dir": "/data/archive/1790719585.273751",
    "newest_archive_date": "2026-09-29T22:22:02.048342+00:00",
    "num_failures": 0,
    "num_outputs": 6,
    "oldest_archive_date": "2026-09-29T22:21:53.739568+00:00",
    "path": "/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/",
    "schema": "Link",
    "scheme": "https",
    "snapshot_id": "ccec36bd-27f9-4776-80f6-d6c128645e18",
    "sources": [
        "/data/sources/1790719585-import.txt"
    ],
    "tags": ",war-wiki,pool,cdispatch_local",
    "tags_str": "war-wiki,pool,cdispatch_local",
    "timestamp": "1790719585.273751",
    "title": "CLW approves $10.2M water, sewer improvements for FY 2027 - The Dispatch",
    "updated": "2026-09-29T22:21:53.739188+00:00",
    "updated_date": "2026-09-29 22:21",
    "url": "https://cdispatch.com/news/clw-approves-10-2m-water-sewer-improvements-for-fy-2027/"
}